• AutoTL;DR@lemmings.worldB
    link
    fedilink
    English
    arrow-up
    4
    ·
    1 year ago

    This is the best summary I could come up with:


    Tokyo-based startup ispace’s (9348.T) lunar lander Hakuto-R Mission 1 failed in April.

    JAXA was planning to start SLIM’s moon landing in January-February 2024 after Monday’s launch, aiming to follow the success of India’s Chandrayaan-3 lunar exploration mission this month.

    The rocket was also carrying an X-Ray Imaging and Spectroscopy Mission (XRISM) satellite, a joint project of JAXA, NASA and the European Space Agency.

    H-IIA, jointly developed by JAXA and MHI, has been Japan’s flagship space launch vehicle, with a success rate of 98% since 2001.

    However, after JAXA’s new medium-lift H3 rocket failed on its debut in March, the agency postponed the launch of H-IIA No.

    Japan’s recent space-related efforts have faced other setbacks, with the launch failure of the Epsilon small rocket in October 2022, followed by an engine explosion during a test last month.


    The original article contains 279 words, the summary contains 136 words. Saved 51%. I’m a bot and I’m open source!