The MIRP seems to be having trouble keeping channels in sync with the broken data, the sync pulses are different sizes on the black and white telemetry bars and breaking the software syncing.
NOAA-APTs attempt at syncing:

  • Thomas DouwesOPM
    link
    fedilink
    arrow-up
    2
    ·
    1 year ago

    The GAC and HRPT for this time is not in CLASS yet, but I will post that when it is

    • Thomas DouwesOPM
      link
      fedilink
      arrow-up
      2
      ·
      edit-2
      1 year ago

      Same parts of the GAC (ch2/ch4):

      Looks like the same as last time, the MIRP is just getting very confused by the corrupted data.
      Although the corruption was on the left side of the scan last time. Now it’s on the right.

      EDIT:
      I’m was being a bit stupid here, I flipped the image, so obviously the corruption is on the other side, this is the same as last time