• BilboBargains@lemmy.world
    link
    fedilink
    arrow-up
    1
    ·
    2 days ago

    One year after a rodent invasion, battled through endless setbacks and filth to finish my loft boarding last week. The pièce de résistance was finally laying all the boards and having an electrical problem. Urgh.

    On the upside, the house is warmer thanks to an extra 200mm of insulation and the usable loft area has been tripled to 45m²