• JackFrostNCola@lemmy.world
    link
    fedilink
    English
    arrow-up
    3
    ·
    edit-2
    5 months ago

    Ironically in this case doing the job properly reduces costs significantly.
    Everything in the chain from the outlets, ductwork, damper, valves, condensers, pipes, tray, fans, component ratings & switchboards can be reduced to a reasonable size.
    Which then has peripheral benefits like reduced transport costs, crane lifts, space in service zones between floors/risers, materials & running costs of the completed building