I dont know why they have to lie about it. At $5/8ft board you’d think I paid for the full 1.5. Edit: I mixed up nominal with actual.

  • glimse@lemmy.world
    link
    fedilink
    English
    arrow-up
    15
    ·
    7 months ago

    I don’t think you’re implying this is exclusively an American issue or anything but that’s just the nature of construction unless you’re paying top dollar for accuracy when it matters.

    I’ve been on a hundred or more construction sites and I’d confidently wager that most houses don’t match the plans perfectly because of unforseen reasons…equipment changing due to lead times, electricians running their conduit in the wrong stud bays, etc. I’ve had to do a lot of creative problem solving and design modifications are inevitable. That’s the only thing I really miss from my old career

    • Fedizen@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      7 months ago

      I’m just saying it doesn’t matter if one guy is really good because on projects that require multiple people a good team is all that matters. As far as uniqueness to the US vs everywhere, its probably worse here in the US but we have a lot of checks for extreme fuckups so we tend to just have a lot of low-mid tier fuckups. The big fuckups are when somebody lies on their expertise (like that university post tensioned beam bridge that fell in florida)

    • Kaity@leminal.space
      link
      fedilink
      English
      arrow-up
      1
      ·
      7 months ago

      Even when you are paying for accuracy… I went to a home once for someone who paid for the builders to get everything perfect; the walls were crooked and warped like every wall I’ve ever seen.